ExxonMobil Starts Production At Third Offshore Guyana Project

The Project Brings Total Production Capacity In Guyana To Approximately 620,000 Barrels Per Day

The Prosperity floating, production, storage and offloading (FPSO) vessel is expected to reach initial production of approximately 220,000 barrels per day over the first half of next year as new wells come online. This additional capacity will be the third major milestone toward reaching a combined production capacity of more than 1.2 million barrels per day on the Stabroek Block by year-end 2027.

ExxonMobil Guyana anticipates six FPSOs will be in operation on the Stabroek Block by year-end 2027. Yellowtail and Uaru, the fourth and fifth projects, are in progress and will each produce approximately 250,000 barrels of oil per day. The company is working with the government of Guyana to secure regulatory approvals for a sixth project at Whiptail.

Prosperity joins the Liza Unity as two of the world’s first FPSOs to be awarded the SUSTAIN-1 notation by the American Bureau of Shipping in recognition of the sustainability of its design, documentation, and operational procedures. According to the company, ExxonMobil’s Guyana developments are generating around 30% lower greenhouse gas intensity than the average of ExxonMobil’s upstream portfolio. According to the independent research firm Rystad Energy, they are also among the best performing in the world with respect to emissions intensity, outpacing 75% of global oil and gas producing assets.

Some 6000 Guyanese are now supporting ExxonMobil Guyana’s activities in the country, representing more than two-thirds of the local oil and gas workforce. The company and its direct contractors have spent more than US$1.2 billion with more than 1500 Guyanese suppliers since operations began in 2015. Production started in December 2019.

ExxonMobil Guyana Limited operates the Stabroek Block and holds 45% interest. Hess Guyana Exploration Ltd. holds 30% interest, and CNOOC Petroleum Guyana Limited holds 25% interest.