Subscribe floating btn

Vision RNG Breaks Ground At Meridian Waste Site

1 minute(s) Read

Vision RNG LLC (VRNG) has broken ground for construction of the renewable natural gas (RNG) project on the Meridian Waste Eagle Ridge Landfill located in Bowling Green, Missouri. The project will use 1500 scfm of landfill gas (LFG) and construction is scheduled to be completed in Q1 2023.

The project will produce 375,000 MMBtu of RNG annually that will be injected into a nearby interstate natural gas pipeline and used by various customers across the United States for transportation fuel and other sustainability purposes. RNG production has numerous environmental and economic benefits, including but not limited to being a carbon-neutral energy solution, lowering methane emissions, reducing dependence on fossil fuels, and utilizing the current natural gas infrastructure.

Based in Canonsburg, Pennsylvania, VRNG was formed in 2021 with funding from Vision Ridge Partners. VRNG is led by a team of experienced oil and gas, RNG, and landfill experts.

“At Meridian Waste, our environmental services team has always considered our landfills to be highly engineered structures that provide a vital resource to our local communities,” said Walter Hall, Meridian Waste’s CEO. “We view the conversion of our LFG to clean energy as an effective means of recycling and reusing this valuable resource. And in our business, wasting energy is simply a waste of time!”

Share This Article

Magazine-CurrentVersion--banner-single

Related Articles

TotalEnergies To Produce Green Hydrogen At La Mède

784
Read Article

Centrica Expands Green Power Portfolio

724
Read Article

European Energy Increases Green Hydrogen Footprint

1005
Read Article

Continue Reading