Subscribe floating btn

GE Wind Turbines Selected For Repowering Project In The Netherlands

0 minute(s) Read

(Image Courtesy Of GE Renewable Energy)

GE Renewable Energy has been selected by Windkoepel Groen to repower part of the Windplan Groen project in Flevoland province in the Netherlands. Repowering involves replacing older units with new, higher capacity turbines or retrofitting them with more efficient components.

With 90 wind turbines across 11 wind parks and an estimated capacity of 500 MW, Windplan Groen is the largest onshore wind farm in the Netherlands in terms of production and installed capacity. GE will provide 26 Cypress 6.0-164 onshore wind turbines at three wind parks (Ansjovisstroom, Hanze, and XY Wind) with the total installed capacity of 156 MW. The three parks are expected to be completed in 2023. The agreement also includes a 25-year, full-service contract.

Share This Article

Magazine-CurrentVersion--banner-single

Related Articles

TotalEnergies To Produce Green Hydrogen At La Mède

1023
Read Article

Centrica Expands Green Power Portfolio

938
Read Article

European Energy Increases Green Hydrogen Footprint

1217
Read Article

Continue Reading